PAVEFORM gratings are laid on a stabilized surface.
From 15 to 60 cm of compacted gravel. Type 0/30 depending on quarry. Thickness depends on the nature of the soil and the purpose of your project. See data sheet.
Cover your soil with a minimum 150-micron geotextile.
Plan your slopes at 1.5 cm/m for rainwater run-off.
Use concrete kerbstones or BORD’EASY finishing strips.
Simply snap the grids into place. Pay close attention to the direction of the paving for a beautiful final aesthetic effect.
The grids must be staggered.
Use an angle grinder to make peripheral cuts.
Fill with 2.5/5 aggregate (or similar) approx. 70 kg/m².
Trowel the surface with a stiff squeegee or helicopter. The surface of the grids serves as a guide.
Circulating after 48 hours.
Easy maintenance with high-pressure water jet
1- Lay and fit PAVÉFORM grids in a staggered pattern on stabilized ground. Plan your slopes at 1.5cm/m for rainwater run-off.
2- Cut the edges with an angle grinder.
3- Fill with aggregates & resin
4- Trowel the surface with a rigid float or helicopter.
Aesthetic, easy to install, easy to drive over, draining and durable!